Modular Scaffolding (Allround)

Modular Stadium (Scaffold Construction)

Manufacturer
Nussli
Model
Modular Stadium (Scaffold Construction)
Code
GW-LFIV3F
Data status
Level 1 / 5
AI-parsed
No photo yet

❋ Specs

6
Construction Type
construction_type
scaffold-based modular
1
Tiers
tiers
1
1
Planning Time
planning_time
1-2months
1
Construction Time
construction_time
4-16weeks
1
Service Life
service_life
up to approx. 2years
1
Cost Vs Permanent
cost_vs_permanent
approx. 30-40% below a permanent concrete structure
1

Every field carries its own trust-tier: core data is confirmed by the manufacturer, peripheral data — by AI (with a source link). Safety-critical parameters (load ratings) are never published below vendor-claimed — a liability requirement.

❋ Discussion

No discussion yet — be the first to start one.

Sign in, to join the discussion.

Spotted an error or know more? Fix it — no sign-up needed.
Check the serial number or Golova ID before buying: whether the device is reported stolen.
Check via Golova ID